PETRO RABIGH Clean Fuel Project/ Sulphur Recovery Unit

Akon GrupPETRO RABIGH Clean Fuel Project/ Sulphur Recovery Unit

Client : Kinetics Technology

Location : Rabigh / KSA

Project Duration : 21 Months

Expected Completion : Apr 2019

Peak Manpower : 240 people

Average Manpower : 180 people

AKON International KSA is awarded the turnkey construction works for the PETRO RABIGH CFP/ SRU project.

The Project includes four packages;
R225 – CFP (Clean Fuel Unit)
R311 – SRU 3 (Sulphur Recovery Unit)
SS27 (Electrical substation)
PIB27 (Process Interface Room)

Within the scope of project, interconnection of the new built units and existing refinery will be achieved. 2 buildings with 1,800 m2 total area will be built.

Total quantites are;
1,600 m2 sheet piling
40,000 m2 excavation
2,800 m2 asphalt paving
3,000 m RTR piping
7,000 m3 reinforced concrete
Architectural works of buildings
Electromechanical works of buildings